Pressure Washing Quote Template
A quote is a firm offer at a fixed price, and it should read like one. This template is the full document — scope, method per surface, exclusions, terms and an acceptance block — ready to copy, edit in place and send. Below it, every field is explained, and there is a worked example filled in with real numbers.
The pressure washing quote template
Edit any field directly in the box, then copy it into your email, invoicing tool or document editor. Nothing is sent anywhere — the text stays in your browser.
Everything in [SQUARE BRACKETS] is yours to replace. The exclusions and terms blocks are the parts worth keeping close to as written — they are what the document is for.
Every field explained
What each block is for, and what it costs you when it is missing.
Quote numberA unique reference, usually year plus a sequence — 2026-0142. It makes follow-up calls unambiguous, keeps your records searchable, and quietly signals that you have done this more than a handful of times.
Valid untilAn actual date, not a duration. "Valid 30 days" requires the customer to do arithmetic; a printed date creates a deadline they can see. It also protects you from a quote written at this season's chemical and fuel prices being accepted next year.
Area (measured)The square footage and the date you measured it. This is what turns the document from an opinion into a fixed price: if the areas are as measured, the price stands. Naming the measurement date also anchors the site-conditions clause in the terms.
Method and PSIPer line, because it varies per line. "Soft wash, under 500 PSI" on siding and "surface cleaner, 3,000 PSI" on concrete tells the customer you know the difference — and it is your defence if damage is alleged on a surface you treated correctly.
SolutionThe chemistry, stated plainly. Customers with pets, planting or a pool will ask, and answering before they ask is worth more than answering well afterwards.
Bundle discountShow it as a line rather than quietly lowering the prices. A visible saving closes better than a lower number with no explanation, and it keeps your per-surface rates intact for the next quote.
Optional add-onsBelow the total, with checkboxes, never folded into the main price. Customers upgrade themselves far more readily than they accept a higher headline figure — and an unticked box costs you nothing.
ExclusionsThe most valuable block on the page. Nearly every dispute in this trade is about what "clean" was supposed to mean. Naming the stains that may not fully lift, before the work, converts a potential argument into an expectation you set.
Access requirementsWater and power are your responsibility to ask about and the client's to provide. Arriving to find a dead spigot or a driveway full of cars costs you a slot you cannot refill.
Weather clauseRain during a wash rarely matters; freezing conditions, high wind carrying your mix onto a neighbour's car, and lightning do. Agreeing the reschedule policy in advance means a delay never turns into a refund conversation.
VariationsOne line stating that out-of-scope work is quoted separately and agreed in writing. It is what lets you say yes to "while you're here, could you just..." without giving the work away.
Acceptance blockA signature, a printed name and a date. This is what makes it a quote rather than an estimate — the customer is accepting a fixed price, and you now have a record that they did.
How to write a pressure washing quote
Seven steps from a measured property to a document a customer can accept.
Measure the job
Measure each surface you will clean and record the areas separately — driveway, walkways, siding by storey, deck, roof. Estimates built on the home's listing square footage rather than actual cleaned area are the most common cause of an underpriced quote.
Price each surface
Apply your per-square-foot rate for each surface and adjust it for condition. Reconcile that market rate against your cost-plus floor — labor, chemical, fuel and overhead divided by one minus your target margin — and take whichever number is higher.
Add travel and apply your minimum
Add a travel line for jobs outside your tight service radius, then check the total against your minimum charge. If the job falls below the minimum, the minimum is the price. A small job carries the same drive and setup overhead as a large one.
Itemize the line items
Write one line per surface showing the area, the method — pressure wash or soft wash — and the price. Itemizing is what justifies a higher price than a competitor who offers a single lump sum, and it lets a price-sensitive customer remove a line instead of asking you to discount everything.
List optional add-ons separately
Put sealing, gutter face brightening, rust removal and any other upsell on their own opt-in lines with their own prices, below the total. Never fold them into the main number. Customers upgrade themselves far more readily than they accept a higher headline price.
Write the terms and exclusions
State the payment terms, deposit rule if any, the weather-reschedule policy, and an explicit list of what the quote does not cover. This is the block that prevents disputes about scope after the work is done.
Number it, date it and send it same day
Give the quote a unique reference number and a specific valid-until date, then send it the same day or within twenty-four hours. Fresh impressions convert fastest, and on commercial work the first complete, professional document through the door frequently wins the contract.
Steps two and three are the ones a calculator does for you. The estimate calculator prices every surface line, applies the bundle discount, holds your margin floor and enforces your minimum in one pass — which means the numbers you paste into the template have already been checked against your costs.
A filled-in example
The same template with a real job in it — a single-storey home with a driveway and a patio, priced at the WashCalc default model.
Optional add-ons quoted separately: driveway sealing +$180, gutter face brightening +$95, rust stain treatment +$60. Payment due in full on completion · no deposit · weather reschedule at no charge · 14-day callback on missed areas.
The line prices come straight from the estimate calculator: 1,800 sq ft of siding in moderate condition at the default $0.30 rate is $648, the 800 sq ft driveway is $211, the 400 sq ft patio in light condition is $100. Behind the customer-facing document, the job carries about 9.7 hours of production time and roughly $408 of cost, so the accepted price of $863 leaves a gross margin near 53%.
Notice what is on the quote and what is not. The customer sees areas, methods, solutions, prices and a visible discount. They do not see the hours, the cost, the margin or the cost-plus floor. Those are the numbers that told you $863 was safe to offer — and volunteering them turns a conversation about the work into a negotiation about your business.
Sending, following up, closing
The document is half of it. This is the other half.
Send it the same day. Within twenty-four hours at the outside. The quote that arrives while the conversation is still fresh converts substantially better than a more polished one sent four days later, and on commercial work the first complete, professional document through the door frequently takes the contract before anyone else has written theirs.
Send it as a PDF. A plain-text quote in the body of an email reads as provisional and reformats unpredictably on a phone. Paste this template into a document, export to PDF, and attach it with two or three sentences of covering email. The email is where you sound human; the attachment is where you sound established.
Follow up twice, then stop. A short message at three or four days and another a few days before the validity date expires. The second one writes itself because the expiry gives you a reason to make contact that is not "just checking in". Beyond two follow-ups you are training yourself to chase work that is not coming.
Reissue rather than amend. If the customer adds a surface or changes the scope, produce a new quote with a revision suffix — 2026-0142-R1 — rather than editing the original. It keeps the record clean, and if there is ever a disagreement about what was agreed, having one document per version rather than one document that quietly changed is worth the extra minute.
Keep the accepted copy. The signed acceptance, the measured areas and the exclusions list are what you will reach for in the rare case something goes wrong. They are also the reference for next year's quote on the same property, which is faster and more accurate than measuring it again.